Your backyard. A second income.
Whether you want rental income, more room for your kids, or a place for your mom to land — Olerra handles permits, foundation, utility hook-ups, and finish. You handle picking the floor color.
Cover your mortgage with a long-term tenant.
House a parent or adult child with dignity.
Add legal square footage to your property.
How an Olerra pays its own mortgage.
Sample math for a 490 in Denver. We'll model your zip code, financing, and tax position in your free property check.
Build my ROI reportWe handle the hard parts.
You hand us the keys.
- Site assessment + feasibility
- Permits and code review
- Foundation + pad
- Crane delivery + setting
- Electrical, plumbing, HVAC tie-in
- Interior finish + appliances
- Final inspection + walk-through
- Picking your finishes (we have palettes)
- Landscaping outside the building envelope
- Financing — we'll connect you to our partner lenders
- Tenant screening (we'll send you our playbook)
Asked & answered.
How long does construction take?+
Four months in our factory, two weeks on your site. Total time from contract to move-in is typically 5–6 months.
Do you offer financing?+
We don't lend in-house, but we partner with three regional banks who specialize in ADU loans, HELOCs, and construction-to-perm refinancing.
What permits do you handle?+
All of them. Structural, electrical, plumbing, mechanical, and zoning. We file with your municipality on your behalf.
Are the units ADA compliant?+
Every model can be configured to ADA standards — roll-in showers, lever sets, accessible counter heights, and ramped entries.
Where can I see one?+
Our model unit is in Loveland, CO. Tours run Thursday–Saturday by appointment.
What about my HOA / city rules?+
Your free property check includes a zoning + HOA review. We'll tell you exactly what's possible on your lot before you commit.
